University of Cincinnati ECUP Upgrades
Client: Member of RMF Engineering led Design Team for the University of Cincinnati
Date: 2023 Upgrades
Services: Life Safety & Building Code Analysis, Interior Architecture, Roof Penetrations, Rendering
Project Description:
The project is intended to add chilled water capacity to the East Campus Utility Plant (ECUP). Included is the removal and replacement of mechanical roof equipment and the resultant modification of the roof. An Electrical Switchgear Room addition occurs withing the existing envelope. SMP is providing Code Consulting services to address occupancy and egress, fire ratings, and other life safety requirements.